A spare parts replacement supply question rarely starts in a spreadsheet. It starts with a photograph a buyer sends: one mesh square bent open, a latch that no longer catches, a pin fitting worn oval at the eye. Behind that image sit three questions asked in one breath — who makes the part, who ships it, and how fast it reaches the yard.
The published record here is a build sheet, not a parts catalogue. Panel and frame dimensions, wire diameter, mesh opening, board sizes and the stall-configuration table are all on record. Part prices, a parts minimum and transit days are not. So this guide keeps the two apart: what you can quote from the documentation, what has to be asked for in writing, and how to package the enquiry so it is priced once.
Key Takeaways
- Published specification covers the parts that fail: 10 mm HDPE boards, 50×50×2.0 mm frame tube, 4.0 mm wire in 50×50 mm openings, ~200 kg per panel.
- Wear concentrates at steel-to-steel joints and moving fittings — pins, latches, hinge lines — rather than in the boards, which do not rot.
- The published minimum of 10 sets applies to stable sets. Nothing published covers a panels-only or hardware-only consignment, so ask it in writing.
- Two routes follow from the published freight options: parts riding with a scheduled container order, or a standalone consignment, with air freight available for urgent items at extra cost.
- The timed promises that are published are front-end: enquiries answered inside 6 hours, drawings or pricing inside 24. Transit days come from your forwarder, not a catalogue.
What actually needs replacing
Split the failure list the way the build does. Boards first: the infill is 10 mm HDPE — high-density polyethylene — specified as UV-stable, antibacterial, washable, rot-proof and resistant to chewing and kicks. Boards are the part buyers fear losing and the part least often in the photograph. Two sizes are published, 2844×1194×10 mm and 3494×1194×10 mm, with door boards at 1024×1054×10 mm.
Then the steel. Frame tubes are 50×50×2.0 mm square tube on Q235, mesh is 4.0 mm wire in 50×50 mm openings, and a 25×25×1.6 mm frame section is documented too — which part that section belongs to is a written-confirmation item. Coating is hot-dip galvanised to a factory commitment of 42 microns and above, with the process run to AS/NZS 4680 (the Australian and New Zealand hot-dip galvanising standard). What gets replaced season after season is rarely a whole frame — it is the moving hardware on it: the tool-free corner pins that make assembly a 30-minute job for two to three people, latch faces, hinges, and the fittings horses work.
Accessory parts sit differently. The documented list includes swivel feeders in aluminium, water bowls, hay racks, corner posts, stainless steel latches, brass caps, decorative balls, rug rails, tie points and wash bays. What each is made of, fitting by fitting, is not published — treat it as a written-confirmation item, not a catalogue line.
Who ships the parts
The works that welded your frames is the source: this is a manufacturer in Anping, Hebei, exporting to AU and NZ, and no AU/NZ local stock is published. So a replacement travels the same route as an original order, and the people who answer are the ones who built it. The published service clock is what makes a parts question workable: replies to enquiries inside 6 hours, drawings or pricing inside 24, third-party QC inspection at the works, and 24×7 after-sales contact.
Two routes follow from the published freight options. The first suits a buyer already on a container rhythm: the part rides with a scheduled order, since the flat pack design already ships frames and boards in the same container volume, and mixing panel sizes sits on the documented dealer concern list alongside minimum order and price steps. The second is a standalone consignment, where the published option is air freight for urgent items at extra cost. What is not published is the pricing of either — no part prices, no freight rates, no trade-term quotes. Those come back as a drawing-cycle answer, not from a brochure.
The honest answer to “who ships it”: the same channel that shipped the first container, on the same documentation trail; only the transit method is yours to choose.
Working out what you need before you write
A parts order goes wrong when the buyer describes damage and the works quotes a unit. Fix that by turning the damage into a bill of parts, using the published configuration table: one bay is 3 panels and 1 door, two adjacent bays are 5 panels and 2 doors, six back-to-back bays are 11 panels and 6 doors. Shared dividers are the reason a bay is not three loose panels — and the reason one damaged divider is a single-panel request, not a bay rebuild.
| Part in question | Record before writing | Ask in writing |
|---|---|---|
| Mesh section or panel | Panel size, wire diameter, opening size, frame tube | Whether a replacement panel matches the frames already erected |
| Corner pins and cleeks | Count per joint, how many are worn or missing | Pin specification and quantity that fits the original joint |
| Door, hinge and latch | Door type, opening width 1150 or 1300 mm, hardware photographed | Latch and hinge material — not published per fitting |
| HDPE board | Board size, thickness, colour (black, white or green) | Whether a loose board ships flat with the next container |
| Coating repair kit | Where the coating is breached and how wide | What the works recommends for a breach on galvanised steel |
Three columns, one rule: describe the part the way it was made, not the way it broke. If the first order left you an approved drawing, the middle column writes itself — the written spec sheet before production covers what that document should have captured.
How fast is the honest part
Speed has three clocks; only two are published. The front clock is the one the works commits to: an enquiry answered inside 6 hours, a drawing or price back inside 24. The middle clock is production, and the only published figure is capacity — roughly 20 sets a week. That tells you something useful: a parts run shares the same shop floor as set orders, so ask which slot your replacement is standing in rather than assuming it is a short job.
The third clock is transit, and it is not published at all — sea routing, port choice and the last leg sit with your forwarder and the delivery arrangements you already use. Ask for it in writing against your own port or property, and remember the two documented levers: flat pack cuts shipped volume, and air freight is available for urgent items at extra cost. For a damaged front wall, the bent mesh repair guide covers what can be straightened on site first, and the first-month corner pin re-tensioning note covers the fittings that loosen before anything needs replacing. For which fittings to photograph, the wet-season hardware walk is the earlier step in this same sequence.
Our position: put parts on the schedule you already have, and spend the air-freight money only on the one fitting that keeps a bay out of use. A panel that waits costs nothing if the stall stayed open; a latch that flies earns its freight if it kept a bay in use.
Frequently Asked Questions
Is there a minimum order for spare panels?
The published minimum of 10 sets covers stable sets, not loose parts. Nothing in the record states a panels-only or hardware minimum, so put that question in writing with the part list attached.
Will a replacement panel fit my existing frames?
Usually, if you order against the as-shipped dimensions — 2844 or 3494 by 1194 by 10 mm boards, 50×50×2.0 mm frame tube, 4.0 mm wire in 50×50 mm openings. Ask for those as confirmation in the enquiry.
How quickly can a part reach AU or NZ?
Transit days are not published. The documented options are sea freight on the flat pack route or air freight for urgent items at extra cost; confirm the calendar with your forwarder in writing.
Who pays for coating repairs under warranty?
No warranty terms are published, so treat this as a written item. The coating record you do have is the factory commitment of 42 microns and above, with the process run to AS/NZS 4680.
Conclusion
Spare parts are a supply question, not a favour request. The works that welded the frame holds the tooling, the coating record and the drawing cycle, and the documented response clock of 6 hours to an enquiry and 24 hours to a drawing or price is what makes a single part orderable.
Convert the damage into a part list before you write, choose sea or air against how the yard is running, and ask the unpriced questions — minimum, freight, warranty — in the same email so the answer comes back complete.